Butt Welded 3D Pipe Bend Welded 24" to 72" ASTM A234 A420 Canghai
Detailed Photos
Product Information
Name | Seamless & Welded Pipe Bends |
Types | Butt weld pipe fittings |
Forged pipe fittings (SW/threaded) | |
Seamless | |
Standards | ASTM A234 WPB ANSI B16.9/ ANSI B16.28 MSS SP43/MSS SP75 JIS2311/JIS2312/JIS2313 DIN2605 GB-12459/GB-T13401 |
Surface | Black painting, Color painting Galvanized, Epoxy coated, 3PE, FBE etc and others as requirement |
Material | Stainless steel: A403 WP304/TP304, WP304L/TP304L,WP316/TP316, WP316L/TP316L, WP321/TP321, WP310/TP310 etc Carbon steel: ASTM A234 GR WPB, WPC, ST37.2, ST35.8, API 5L GR/B, API 5L X42/X52/X60/X65/X70/X80 PSL1&PSL2 Alloy steel: WP11, WP22, WP12, WP5, WP9, WP91 |
Stainless steel: A182 F304, A182F304L,A182 F316, A182 F316L, A182 F321, A182 317H, A182316Ti, F53,F51 Carbon steel: A105, A350LF2 Alloy steel: A182 F11, A182F22, A182F12,A182 F5, A182F91, A182 F9, A420 WPL6, A860 WHPY42/52/62/65/70/80 etc |
|
Brand | Hebei Canghai Nuclear Equipment Technology Co.Ltd. |
Angle | 15°, 22.5°, 30°, 45°, 60°, 90°, 180° or custom |
Sizes | 1/2"-36" seamless, 24"-72" welded |
Quality testing
Exhibition Pictures
Picture of Packaged
Application Area
FAQ
1. Are you a factory or trading company?
We are a factory.
2. How can I get a quotation from you ?
You can leave us message, and we will reply every message in time. And you can also find our contact information on contact page.
3.Can I get samples before order ?
Yes, of course. we can produce by your samples or technical drawings.
4.What is your payment terms?
Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.
5.How does your factory do regarding quality control?
Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified. And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished, we will make the last test to pick up the unqualified products.
6.What is your MOQ?
As your requirements.