5D 90degree Carbon Steel Bend ASME B16.49 Carbon Steel Bend Canghai
Product Description
-
Bend
Bends, vital in piping systems, redirect fluid flow across industries like plumbing and oil - gas. The prevalent manufacturing method is bending. Hot bending heats the pipe (e.g., steel pipes above 900°C) to boost malleability, using hydraulic bending machines for precise shaping, ideal for thick - walled or large - diameter pipes. Cold bending, done at room temperature, capitalizes on the pipe's ductility, suiting thinner - walled and smaller - diameter ones. They can also be crafted via welding and forming. Materials range widely; steel is favored for its strength in high - pressure scenarios.
Detailed Photos
Product Description
| Product | Steel bend |
| Size | Seamless Size:DN15 - DN1200 Welded Size:DN200 - DN2000 |
| Material | Carbon Steel:ASTM A234 WPB, WPC; ASTM A420 WPL9, WPL3, WPL6, WPHY - 42,WPHY - 46, WPHY - 52, WPHY - 60, WPHY - 65, WPHY - 70 Alloy Steel:ASTM A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 Stainless Steel:ASTM A403 WP304/304L, WP316/316L, WP321, WP347, WPS 31254 |
| Wall Thickness | SCH10;SCH20;SCH30;STD;SCH40;SCH60; SCH80;SCH100;SCH120;SCH160;XS;XXS |
| Our Brand | Hebei Canghai Nuclear Equipment Technology Co.Ltd. |
| Standards | ASME B16.9; GB12459; DIN2615; GOST17375; JIS B2311 |
| Application | Water Disposal; Electric Power; Chemical Engineering; Ship Building; Nuclear Energy; Garbage Disposal; Natural Gas; Petroleum Oil |
| Delivery Time | Within 30 - 45 days after receiving the deposit |
| Packing | Seaworthy package Wooden Cases Pallet or as per customers requirement |

Quality Testing

Product Process

Picture of Packaged


Main Products

FAQ
1. Are you a factory or trading company?
We are a factory.
2. How can I get a quotation from you ?
You can leave us message, and we will reply every message in time. And you can also find our contact information on contact page.
3.Can I get samples before order ?
Yes, of course. we can produce by your samples or technical drawings.
4.What is your payment terms?
Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.
5.How does your factory do regarding quality control?
Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified. And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished, we will make the last test to pick up the unqualified products.
6.What is your MOQ?
As your requirements.





